Betonica

Installation

Built to be installed
like it's permanent.

Installation is engineered for precision and durability, delivering a seamless, professional finish built to last, from substrate prep through to sealing.

Surface Preparation - installation step 1

1. Surface Preparation

Stable surfaces: Can be installed on any solid base.

Wood, metal, or insulation: Must be covered with a metal mesh (5–10 cm grid), overlapped by 5 cm, and secured with screws or nails every 15–20 cm.

Waterproofing: Apply a protective coating (PVC varnish) on wooden bases before the mesh.

Base coat: For mesh surfaces, apply a thin cement layer and let dry for 24–48 hours. Concrete and brick walls only need cleaning and light moistening.

Layout & Planning - installation step 2

2. Layout & Planning

Marking: Use a level and chalk line to draw horizontal guide lines.

Blending: Open several boxes at once and pre-arrange 2–5 m² on the ground to mix colour shades naturally.

Cleaning: Wire-brush the back of the tiles to remove dust. Ensure they are clean but not soaking wet.

Application & Mounting - installation step 3

3. Application & Mounting

Adhesive: Use cement-based tile adhesive (for stone/concrete) or gypsum adhesive (for gypsum products).

Consistency: The mortar should be thick enough not to slide off a vertical trowel.

Technique: Press the element firmly and wiggle it slightly to distribute the glue.

Pressure: Apply enough pressure so the adhesive spreads to the edges. For large pieces, apply glue to the edges only to create a “vacuum effect.”

Thickness: Aim for a 5–10 mm adhesive layer.

Grouting & Finishing - installation step 4

4. Grouting & Finishing

Exterior walls: Joints must be fully sealed to prevent water damage.

Jointing: Use a grout bag or spatula. For a “dry-stack” look, let the squeezed-out mortar dry for 12–18 hours before cleaning with a wooden stick.

Brick cladding: Often requires no extra grout if the adhesive fills the gaps during pressing.

Sealing: You may apply a water-based stone sealer 2–3 days after installation once completely dry.

Tool checklist

What you'll need.

Have these ready before you start.

  • Spirit level
  • Chalk line
  • Wire brush
  • Notched trowel
  • Angle grinder + diamond blade
  • Drill with paddle mixer
  • Bucket
  • Damp sponge

Get started

Choose Betonica for your next project.

Join dozens of architects and designers who choose Betonica for their flagship projects.